CURRENT AND COMPLETED PROJECTS
View a selection of work completed by our workforce under a Main Contractor...
BOC Gas Glenfield
A Complex project with large foundations and pads for new plant.
Foundations were 10.5m x 20m x 2m deep, just over 400m₃ in each foundation slab x 3.
Lots of health and safety requirements on this site due to existing gas plants in close proximity.
Bidvest Foods Queenstown
Large project, 7.5 million dollars.
A complex build throughout the winter months, competing with environmental factors such as rain, hail, below -12° temperatures and large snowfalls.
The building boasts new offices, freezer, chiller, fresh foods area, large yard area and an elevated loading area with 2 dock levelers.
Freezer area measures 40m x 25m x 11m high stud, temperature kept at a constant minus 26°.
A difficult job and a good result
Bidvest Foods Mangere
Project value 10 million dollars.
The largest of the Bidvest builds. Precast panels again made on site to save our client the transport cost, but also very large panels, 23 tonne each, 16m x 3.5m x 190mm thick.
52 of these panels in total made it 2 pour sequences.
Staff on site from start to finish, large and rewarding project, building footprint 6500m₂ and yard 5000m₂.
Cameron Pools, Mt Roskill
Basic rebuild on roof structure as this had been corroded by chemicals used within the pool complex.
New timber rafters/connection points and roofing material.
Capital Smart Repairs, Penrose
This complex is a new operation based in New Zealand. Project value 4 million. Another start to finish project, panel beating repair shop for moderate to medium collisions.
Point of difference being that your vehicle is completed within 24 hours of drop off. Very tidy operation as New Zealand's first ultra sonic oven, 8 minutes after paint application you drive away.
It was a pleasure to work with Jim and his team from Capital Smart repairs on this venture.
Cato Balum, Henderson
Another tight challenging site, project value 2.5 million dollars.
Cato Bolam consultant's new office features new offices, pop up atrium and underground basement.
Another start to finish project and happy customer.
DB Breweries, Otahuhu
New slabs for future growth of DB Breweries, large foundations and laydown areas for new stock.
Dorma Door Controls, Patiki Rd
A new build for Dorma Door Controls with large warehouse and new office with retail and bakery below, project value 2.5 - 3 million dollars. Start to finish.
ST WORKFORCE